Thursday, 25 July 2019

Construction of the station building Part II

Small update. I have cut out window frames and roof from foam underlay floor sheets. The window frames stick out about 5 mm. so they come at the same level as the concrete plaster when applied. At first I tried to make the frames as straight and neat as I could but I gave up on this along the way. Some imperfect window and door frames could give it a bit of dilapidated look that I like more than a neat and perfect building. Lets see if this work.

I forgot to cut out the holes in the roof for the solar lights. That must be done later, when the glue has dried.





-o-

No comments: